Special asphalt - メーカー・企業と製品の一覧

Special asphaltの製品一覧

1~2 件を表示 / 全 2 件

表示件数

Crack Prevention "Rubber Asphalt Coating Method"

A repair material for damaged pavement that allows traffic to be opened 10 to 20 minutes after construction! It suppresses cracks and prevents peeling of the pavement!

Rubber asphalt is a special asphalt with fillers developed using reclaimed automotive lubricating oil as a base material. It has good workability and allows for traffic to be opened 10 to 20 minutes after application. It integrates closely with existing pavement and new pavement, helping to suppress cracks and prevent peeling of the pavement. 【Features】 ■ Does not melt on hot summer days ■ Retains some softness in cold winter weather ■ Allows vehicles to pass immediately after application ■ Not rubber-based ■ Low elasticity type ■ Reduces the discharge of pavement waste *For more details, please request materials or view the PDF data available for download.

  • Renovation and repair methods
  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Crack Suppression "Rubber Asphalt Coating Method"

For suppressing reflection cracks, preventing peeling, and stopping water leaks! It demonstrates the prolonging effect of paint with repairs that do not require reapplication.

The "Rubber Asphalt Coating Method" is a technology that can extend the life of pavement by repairing medium-sized damaged areas without replacement. After melting, the rubber asphalt is poured into the repair area and applied with a rubber rake, and after curing, it is paved with a heated asphalt mixture. It is a special asphalt with fillers developed for the purpose of suppressing reflection cracks, preventing peeling, and stopping water infiltration. 【Features】 ■ Extends the life of the coating with repairs without replacement ■ Can be reused as pavement waste ■ Does not melt in the summer heat ■ Suitable for construction from surface treatment of 0.1m² to long extensions and large areas ■ Good workability, allowing traffic to resume 10 to 20 minutes after construction *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録